Replacement & Upgrade of 415V Switchgear
Scope of Work
Replacement of seven 415V switchgears, supply and installation of two 110V DC UPS.
Engineering, procurement, construction, and commissioning.
Power system study.
Engineering to match footprints.
Procurement and installation using temp boards.
Hot changeover to new panels.
Procurement and installation of two 100V DC UPS.
Commissioning of UPS.
Replacement of seven 415V switchgears, supply and installation of two 110V DC UPS.
Engineering, procurement, construction, and commissioning.
Power system study.
Engineering to match footprints.
Procurement and installation using temp boards.
Hot changeover to new panels.
Procurement and installation of two 100V DC UPS.
Commissioning of UPS.