E&I construction works for green field and brown field for IGD project:

Installation, testing, and commissioning of MV/LV switchgears, power and distribution transformers, as well as UPS.

Installation of 12 km. cable trays.

Below ground and above ground cabling – 720 km.

Cable glanding and termination – 14,500 glands.

Calibration, installation, and pre-commissioning works for field instruments – 1,600 nos.

Installation and pre-commissioning of IPCMS, PMS/LCS, and DCS/ESD system.

Lightning and earthing protection.

Heat tracing and cathodic protection.