Integrated Gas Development (IGD) Project (Green Field & Brown Field)
Scope of Work
E&I construction works for green field and brown field for IGD project:
Installation, testing, and commissioning of MV/LV switchgears, power and distribution transformers, as well as UPS.
Installation of 12 km. cable trays.
Below ground and above ground cabling – 720 km.
Cable glanding and termination – 14,500 glands.
Calibration, installation, and pre-commissioning works for field instruments – 1,600 nos.
Installation and pre-commissioning of IPCMS, PMS/LCS, and DCS/ESD system.
Lightning and earthing protection.
Heat tracing and cathodic protection.
E&I construction works for green field and brown field for IGD project:
Installation, testing, and commissioning of MV/LV switchgears, power and distribution transformers, as well as UPS.
Installation of 12 km. cable trays.
Below ground and above ground cabling – 720 km.
Cable glanding and termination – 14,500 glands.
Calibration, installation, and pre-commissioning works for field instruments – 1,600 nos.
Installation and pre-commissioning of IPCMS, PMS/LCS, and DCS/ESD system.
Lightning and earthing protection.
Heat tracing and cathodic protection.