Replacement of Obsolete 11kV Switchgear

Scope of Work

Engineering, procurement, construction, and commissioning.

33/11kV power transformers, 11kV switchgear, and shifting 3.3kV camp feeders to 11kV network.

Existing 33KV switchgear modifications.

Modifications to existing SCMS, PMS, and DCS.

NER, NE transformer, and RTCC panel.

Construction of substation buildings and necessary cable trenches.

Pre-commissioning, commissioning, training, and handover.