Replacement of 42 LV Switchgear & Transformers

Scope of Work

Replacement of 42 415V switchgears

Supply and installation of two 11kV/415V and 2 MVA dry type transformers.

Engineering studies such as load flow, short circuit, relay coordination using ETAP Software.

Replacement of 42 nos. LV switchgears on existing footprint after removing existing switchgears, 11kV/415V, 2 MVA dry type transformers, 11kV switchgear modification in ZWAP, power and control cables (11kV and LV).

Provided temporary LV switchgears and cables during the 42 nos. LV switchgear replacement.

Integrated protection, control and monitoring system for LV switchgears.