Scope of Work
Modification in LV switchgear, lighting, and small power for 4 nos. chemical storage sheds.
Supply and installation of SMDB, DBs, and lightning protection for 4 sheds.
Fire alarm for 4 sheds and integration with existing FA system.
Telephone and data system for office area and integration with existing system.
HVAC system – split A/C and package A/C units and duct work for office area.
Modification in LV switchgear, lighting, and small power for 4 nos. chemical storage sheds.
Supply and installation of SMDB, DBs, and lightning protection for 4 sheds.
Fire alarm for 4 sheds and integration with existing FA system.
Telephone and data system for office area and integration with existing system.
HVAC system – split A/C and package A/C units and duct work for office area.