E&I Works for Asab Accommodation Facilities – Phase 1 & 2
Scope of Work
Design, engineering, procurement, construction, installation, and commissioning of electrical network.
Electrical distribution network – 11kV substation (Total 10 MVA) with 11kV panel from ABB, 3 LV 5000 A panels from Comeca, and 6 transformers, 10kVA UPS.
Earthing works, including a deep well earth (>60m) and lightning protection works.
Supply and installation of 11kV switchgear, MCC’s, 3.15MVA transformers, bus ducts, and UPS.
Modification of existing 11kV feeder.
New substation design with 11kV SWGR (ABB).
Transformers (4 nos. 3.15MVA).
Design, engineering, procurement, construction, installation, and commissioning of electrical network.
Electrical distribution network – 11kV substation (Total 10 MVA) with 11kV panel from ABB, 3 LV 5000 A panels from Comeca, and 6 transformers, 10kVA UPS.
Earthing works, including a deep well earth (>60m) and lightning protection works.
Supply and installation of 11kV switchgear, MCC’s, 3.15MVA transformers, bus ducts, and UPS.
Modification of existing 11kV feeder.
New substation design with 11kV SWGR (ABB).
Transformers (4 nos. 3.15MVA).