| YEAR STARTED | YEAR ENDED | CONTRACTOR | END USER | PROJECT NAME | LOCATION |
|---|---|---|---|---|---|
| 2018 | 2019 | Emirates Steel | Package Substation Near HSM & Power Supply Arrangement for Dust Agglomeration Facility | Mussafah | |
| 2018 | 2019 | Etisalat | Power Upgrade Works in Telecom Building at Mina Al Seyahi Exchange Dubai | Dubai | |
| 2018 | 2019 | Etisalat | Power Upgrade Works at West Exchange Complex Abu Dhabi | Abu Dhabi | |
| 2016 | 2019 | ADNOC Offshore (ADMA-OPCO) | Electrical & Instrumentation Works at Offshore (Call Off) | Offshore Platforms | |
| 2015 | 2017 | ADNOC Gas Processing (GASCO) | EPC for Upgrading Substation 19 at Maqta | Maqta | |
| 2015 | 2016 | ADNOC LNG (ADGAS) | Upgrade of Conventional Fire Alarm System in Portacabin Offices at Non-Industrial Area | Das Island | |
| 2015 | 2016 | GE | Zirku 5XFR5 Mark V to Mark VIe Upgrade | Zirku Island | |
| 2015 | 2016 | ADNOC Gas Processing (GASCO) | EPC for Upgrading Substation 19 at Maqta | Maqta | |
| 2015 | 2016 | GTM | ADNOC Gas Processing (GASCO) | Electrical Works for Accommodation Extension Al Maha Camp | Bu Hasa |
| 2015 | Tagstone | ADNOC Offshore (ZADCO) | Installation Works for Personnel Tracking System | Zirku Island | |
| 2015 | 2019 | ADNOC Offshore (ADMA-OPCO) | Upgrade of Low Voltage Switchgear & Transformers at ZWSC & ZCSC | ZWSC & ZCSC | |
| 2015 | 2017 | Petrofac | ADNOC Offshore (ZADCO) | Electrical, Instrumentation, Telecommunications and Cathodic Protection Works at South & North Artificial Islands for Upper Zakum 750K Project Island Surface Facilities ECP2 | South, North & West Island |
| 2014 | 2017 | ADNOC LNG (ADGAS) | EPC for ADMA Switchgear Upgrade Project | Das Island | |
| 2014 | 2015 | ADNOC Offshore (ADMA-OPCO) | Additional UPS for Das Disaster Computer Room at Telecom Building | Das Island | |
| 2014 | 2016 | Granite - ABB | ADNOC Offshore (ZADCO) | Power Upgrade Project - Zirku Facilities | Zirku Island |
| 2014 | 2015 | ADNOC Onshore (ADCO) | Replacement of Obsolete 11kV Switchgears at Dabbiya & Rumaitha | Dabbiya & Rumaitha | |
| 2013 | 2014 | ADNOC Onshore (ADCO) | Rehabilitation of Electrical Distribution Supervisory System at NEB Fields | Dabbiya & Rumaitha | |
| 2013 | 2014 | Granite | ADNOC Offshore (ZADCO) | Zirku C & C Post OSAT Works | Zirku Island |
| 2013 | 2014 | ADNOC Offshore (ADMA-OPCO) | Replacement of Junction Box & Modification of Fire Detection System of Gas Turbines at PGB | USSC & ZWSC | |
| 2013 | 2015 | SiGED Emirates | ADNOC Offshore (ADMA-OPCO) | Instrumentation Work at EZ 20E | ZCSC |
| 2012 | 2014 | ADNOC Gas Processing (GASCO) | Replacement of Obsolete 11kV Switchgear / Shifting 3.3kV Camp Feeders to 11kV Network | Bu Hasa | |
| 2012 | 2013 | ADNOC Refining (TAKREER) | EPC & Commissioning Works for Sulphur Recovery Unit (SRU) at Abu Dhabi Refinery | Abu Dhabi | |
| 2012 | 2013 | ADNOC Gas Processing (GASCO) | Substation Internal Lighting Replacement at GASCO Bu Hasa Plant | Bu Hasa | |
| 2012 | 2012 | ADNOC Fertilizers (FERTIL) | Upgrade of Pneumatic Instruments | Ruwais | |
| 2012 | 2013 | Granite | ADNOC Offshore (ADMA-OPCO) | Refurbishment of ADMA-OPCO Main Office Store Building | Das Island |
| 2012 | 2013 | ADNOC Refining (TAKREER) | Replacement of Switchboard at Substation 26 in Abu Dhabi Refinery | Abu Dhabi | |
| 2012 | 2013 | Granite | ADNOC Gas Processing (GASCO) | Electrical & Instrumentation Works for ZADCO Satah Full Field Development Project | Satah |
| 2012 | 2013 | GTM | ADNOC Gas Processing (GASCO) | Shower and Tea Room Facilities at Ruwais SGP | Ruwais |
| 2012 | 2013 | ADNOC Gas Processing (GASCO) | Upgrade of Emergency Siren System - Asab 1 & 2 | Asab | |
| 2012 | 2013 | Granite | ADNOC Gas Processing (GASCO) | New Additional Building at Asab 1 & 2 | Asab |
| 2013 | 2013 | MDS | ADNOC Offshore (ADMA-OPCO) | Replacement & Upgrade of UPS System PGB at ZWSC & USSC | ZWSC & USSC |
| 2012 | 2013 | Hyundai Heavy Industries | ADNOC LNG (ADGAS) | Electrical & Instrumentation Installation, Tie-In Work, Pre-commissioning, Commissioning and Start-Up Assistance for the Integrated Gas Development (IGD) Project | Das Island |
| 2011 | 2014 | ADNOC Offshore (ADMA-OPCO) | Supply and Installation of Remote Telemetry Units on Well Head Towers (EPC) – Offshore | Umm Shaif & Zakum | |
| 2011 | 2013 | Granite | ADNOC Gas Processing (GASCO) | Construction of New Avenue “B” – Ruwais | Ruwais |
| 2011 | 2015 | ADNOC Offshore (ADMA-OPCO) | Replacement & Upgrade of 415V Switchgears – USSC | Umm Shaif | |
| 2011 | 2013 | Page Europa | KPIZ | Khalifa Port Special System Project | Taweelah |
| 2011 | 2012 | ADNOC Refining (TAKREER) | Polybed PSA Unit Revamp at Ruwais Refinery | Ruwais | |
| 2011 | 2012 | ADNOC LNG (ADGAS) | Upgrade Fire Alarm System at Sahil | Das Island | |
| 2011 | 2012 | Al Fara'a | ADNOC Gas Processing (GASCO) | New Management Building and 2 Auditoriums | Bu Hasa |
| 2011 | 2013 | Daewoo E&C | ADNOC Refining (TAKREER) | Instrumentation Work for Ruwais Refinery Expansion Project – Pkg 4 (Storage Tanks) | Ruwais |
| 2011 | 2013 | Al Fara'a | ADNOC Gas Processing (GASCO) | Habshan Industrial Facilities | Habshan |
| 2011 | 2016 | ADNOC LNG (ADGAS) | Electrical & Instrument Services at Das Island / Term Contract for Modification | Das Island | |
| 2011 | 2013 | Granite | ADNOC Gas Processing (GASCO) | Security Fencing at Asab | Asab |
| 2010 | 2013 | Granite | AIS | Security Fencing at Das Island | Das Island |
| 2010 | 2013 | Samsung Engineering | ADNOC Refining (TAKREER) | Ruwais Refinery Expansion – Utilities and Offside Unit E&I | Ruwais |
| 2010 | 2011 | OTV – BESIX Sanotec JV | ADWEA | Allahamah Waste Water Treatment Plant | Allahamah, Al Ain |
| 2010 | 2010 | Daewoo E&C | ADNOC Refining (TAKREER) | Ruwais Refinery Expansion – Tankage and Piping Unit | Ruwais |
| 2010 | 2010 | Tefken | ADNOC Onshore (ADCO) | SAS Fields E&I and Telecom Works | SAS (Sahil, Asab, Shah) |
| 2010 | 2010 | OTV-Veolia | Al Wathba Waste Water Treatment Plant | Al Wathba | |
| 2010 | 2011 | Granite | ADNOC Gas Processing (GASCO) | Asab Accommodation Facilities Phase-2 | Asab |
| 2009 | 2011 | ASCON | ADNOC Gas Processing (GASCO) | Non Process Building at GASCO Plant | Ruwais |
| 2009 | 2010 | OTV-Veolia | Fujairah Asia Power Co. | Sea Water Desalination Plant, Fujairah II – Reverse Osmosis Plant | Fujairah |
| 2008 | 2013 | Honeywell | ADNOC Offshore (ZADCO) | Zakum Phase II C WHPT SCS Works – Electrical & Instrumentation Works | Zakum Field |
| 2008 | 2010 | PKE Gulf | Yas Marina Circuit | F1 Race Track Yas Island – PKE-Siemens Project | Yas Island |
| 2008 | 2010 | ADNOC LNG (ADGAS) | Implementation of SIL Study Recommendations for Trains 1, 2 & 3 and Boilers 1-6 | Das Island | |
| 2008 | 2009 | ADNOC Offshore (ADMA-OPCO) | Upgrade of Instrument Air Dryer Control System | Zakum Field | |
| 2008 | 2008 | ADNOC | E&I Works Associated with Terminal Automation at Zaher Terminal | Al Ain | |
| 2008 | 2008 | Granite | ADNOC LNG (ADGAS) | Permanent Training Centre & Lab Building | Das Island |
| 2008 | 2008 | ADNOC Gas Processing (GASCO) | Asab Accommodation Facilities (Phase I) | Asab | |
| 2008 | 2008 | Costain | ADNOC LNG (ADGAS) | ADGAS upgrade of Portable Water System | Das Island |
| 2008 | 2008 | Granite | Borouge | Offsite & Utilities Project | Ruwais |
| 2007 | 2010 | ADNOC Offshore (ADMA-OPCO) | Replacement of RTU/SCADA at Umm Shaif and Zakum Fields | Umm Shaif & Zakum Field | |
| 2007 | 2009 | ADNOC Offshore (ADMA-OPCO) | Installation of Pig Alerts & Level Transmitter at ZWSC | Zakum Field | |
| 2007 | 2009 | ADNOC Offshore (ADMA-OPCO) | Installation of Ultrasonic Flow Meters at ZWSC | Zakum Field | |
| 2007 | 2009 | Granite | Tecnimont / Borouge | Temporary Office Facilities- Electrical & Instrumentation Works in Borouge | Ruwais |
| 2007 | 2009 | Granite | ADNOC Gas Processing (GASCO) | Electrical, Instrumentation, Structured cabling and Cable Network in Asab | Asab |
| 2006 | 2010 | Honeywell | ADNOC Offshore (ZADCO) | Modernization of Scada & Instruments / Control System (Mosaics) | Zirku Island |
| 2006 | 2007 | ADNOC Offshore (ADMA-OPCO) | Boilers 3, 4, & 5 Control System upgrade – Das Island | Das Island | |
| 2006 | 2007 | Granite | ADNOC Refining (TAKREER) | Onshore Gas Development Project | Ruwais |
| 2006 | 2007 | Granite | Bechtel / ADNOC Gas Processing (GASCO) | AGD II Construction camp & Temporary facilities – Electrical Fire Alarm, TV, Network in Asab | Asab |
| 2006 | 2006 | Granite | ADNOC Gas Processing (GASCO) | Non Process Buildings – EPC Building in Habshan | Habshan |
| 2005 | 2008 | SNC-Lavalin | ADNOC Refining (TAKREER) | BeAAT Project – Electrical & Instrumentation Works | Ruwais |
| 2005 | 2006 | Zublin | ADNOC Refining (TAKREER) | Power Interconnection Project | Ruwais |
| 2005 | 2006 | ADNOC Offshore (ADMA-OPCO) | Sour Water De-Oiling Plant (SWDP) Control System Replacement | Das Island | |
| 2005 | 2005 | GCC | ADNOC Gas Processing (GASCO) | AGD II Project Team Accommodation | Asab |
| 2005 | 2005 | ADNOC Gas Processing (GASCO) | Utilization of Spare Capacity in OGD-II Vapour Recovery | Habshan | |
| 2005 | 2005 | ADNOC Offshore (ADMA-OPCO) | SWDP Control System Replacement | Das Island | |
| 2005 | 2005 | CAT | ADNOC Onshore (ADCO) | Asab Water Injection Upgrade | Asab |
| 2005 | 2005 | Siemens | ADNOC LNG (ADGAS) | ADGAS PSU Project | Das Island |
| 2005 | 2005 | Granite | ADNOC Gas Processing (GASCO) / ADNOC Refining (TAKREER) | Power Interconnection between GASCO Ruwais & TAKREER GUP | Ruwais |
| 2005 | 2005 | Granite | ADNOC Gas Processing (GASCO) | Miscellaneous Civil Works | Bu Hasa |
| 2004 | 2004 | Khansaheb Hussain | ADNOC Onshore (ADCO) | Miscellaneous Civil Works | Bu Hasa |
| 2004 | 2004 | Khansaheb Hussain | ADNOC Gas Processing (GASCO) | Deep Well Earthing of Water Injection Cluster | Bu Hasa |
| 2004 | 2004 | Al Masaood Bergum | ADNOC Gas Processing (GASCO) | Students Training Center | Habshan |
| 2003 | 2005 | Invensys | ADNOC Offshore (ZADCO) | Modernization of SCADA & Instruments / Control System (MOSAICS) | Zakum Field |
| 2003 | 2005 | Honeywell | ADNOC Offshore (ZADCO) | Modernization of SCADA & Instruments / Control System (MOSAICS) | Zakum Field |
| 2003 | 2003 | Al Otaiba & Garg Contracting | ADNOC Distribution | Filling Station #890 Al Wathba | Al Wathba |
| 2003 | 2003 | ADNOC Distribution | Filling Station #978 Gayathi | Gayathi | |
| 2003 | 2003 | H.E. Sheikh Suroor Bin Mohd. Al Nahyan | Abu Dhabi Trade Center | Abu Dhabi | |
| 2003 | 2003 | ADNOC Gas Processing (GASCO) | New Contractors Camp (Phase II) | Bu Hasa | |
| 2003 | 2003 | ADNOC Offshore (ZADCO) | Modernization of SCADA & Instruments / Control System (MOSAICS) | Zakum Field | |
| 2002 | 2002 | ADNOC | Construction of Civil Defence Building | Ruwais | |
| 2002 | 2002 | ADNOC Offshore (ADMA-OPCO) | Cathodic Protection of Crude Oil Storage Tanks | Das Island | |
| 2002 | 2002 | ADNOC Gas Processing (GASCO) | Nitrogen Plant Instrumentation Revamping Project | Habshan | |
| 2002 | 2002 | Johnson Controls | Etisalat | Etisalat HQ Building | Abu Dhabi |
| 2002 | 2002 | ADNOC Gas Processing (GASCO) | New Pre-fabricated Caravans | Habshan | |
| 2002 | 2002 | ADNOC | Construction of New Mosque | Abu Dhabi | |
| 2001 | 2003 | Alstom | ADNOC | Telecom Package Installation and Commissioning – Borouge Ethylene Plant | Ruwais |
| 2001 | 2001 | KTI / Technip | ADNOC Gas Processing (GASCO) | Ruwais Upgrade Project/Sulphur Recovery Units | Ruwais |
| 2000 | 2000 | Johnson-Mannesmann | Govt. of Dubai | Al Awir Sewage Treatment Plant Expansion | Dubai |
| 2000 | 2000 | McConnell Dowell | ADNOC Refining (TAKREER) | Gas Supply to Taweelah Power Station | Taweelah |
| 2000 | 2000 | ADNOC Gas Processing (GASCO) | Civil Works Package/Warehouse Ventilation Works | Ruwais | |
| 1999 | 1999 | BK Gulf | Govt. of Dubai | Chicago Resort Development Project | Dubai |
| 1999 | 1999 | Technip | Govt. of Ras Al Khaimah | New Ras Al Khaimah Cement Plant | Ras Al Khaimah |
| 1998 | 1998 | ADNOC LNG (ADGAS) | Active Fire Protection System at Jetty Head | Das Island | |
| 1998 | 1998 | Al Habtoor | UAE Armed Forces | CAE ADW-011 | Sweihan |
| 1998 | 1998 | HBB - Balfour Beatty | ADNOC | ZADCO & GASCO HQ Building | Abu Dhabi |
| 1998 | 1998 | Power Transmission Gulf | ADNOC | ADMA-OPCO & ADGAS HQ Building | Abu Dhabi |
| 1997 | 1999 | Govt. of Dubai | Dubai Dry Docks | Dubai | |
| 1997 | 1998 | ADNOC LNG (ADGAS) | Active Fire Protection at Jetty Head | Das Island | |
| 1997 | 1997 | SPC / Cegelec | Abu Dhabi Municipality | Mafraq Sewage Treatment Plant | Mafraq |
| 1997 | 1997 | Bechtel | ADNOC Offshore (ADMA-OPCO) | Instrumentation Services at Umm Shaif & Zakum Super Complex | Umm Shaif & Zakum Field |
| 1997 | 1997 | GENIPO | Ministry of Public Works | Electrical Services | Abu Dhabi |
| 1996 | 1996 | PECE | ADNOC | Upgrade of Compressors Control System | Habshan |
| 1996 | 1996 | ADNOC LNG (ADGAS) | Boiler Burner Management System PLC | Das Island | |
| 1993 | 1993 | ADNOC | On Line Analyzers for Ruwais | Ruwais | |
| 1993 | 1993 | ADNOC Onshore (ADCO) | New Pump House Control Room | Jebel Dhanna | |
| 1993 | 1993 | Qatar Petroleum | Electronic Instrument Maintenance | Qatar | |
| 1992 | 1992 | Bechtel - Technip JV | Qatar Petroleum | North Field Project Phase II Gas Sweetening Plant | Qatar |
| 1992 | 1992 | Qatar Petroleum | North Field Project | Qatar | |
| 1992 | 1992 | UOC | ADNOC | PSI Unit Revamp | Ruwais |
| 1992 | 1992 | NPCC | ADNOC Onshore (ADCO) | Control System Modifications | Jebel Dhanna |
| 1991 | 1991 | Mutawa | ADNOC Offshore (ADMA-OPCO) | Supply of Switchboard | Das Island |
| 1991 | 1991 | Al Mohairbi | ADNOC Onshore (ADCO) | Upgrade of Asab Fire Fighting System | Asab |
| 1990 | 1990 | ADNOC Fertilizers (FERTIL) | Ruwais Fertilizer Complex | Ruwais | |
| 1990 | 1990 | ADNOC Onshore (ADCO) | New Control Room for Asab Oil Gathering System | Asab | |
| 1990 | 1990 | ADNOC LNG (ADGAS) | New Process Control System | Das Island | |
| 1990 | 1990 | Total ABK | Gas Meter Proofer AKW, AKFW, & AKE | Abu Al Bukhoosh Field | |
| 1990 | 1990 | Total ABK | AKC OTIS Cabinet Job No TN518 | Abu Al Bukhoosh Field | |
| 1990 | 1990 | Total ABK | Control Panels-Job No.486 | Abu Al Bukhoosh Field | |
| 1990 | 1990 | Total ABK | Fire & Gas Revamping Offshore | Abu Al Bukhoosh Field | |
| 1990 | 1990 | GPC | ADNOC Offshore (ADMA-OPCO) | Water Injection Project | Das Island |
| 1989 | 1989 | Mutawa | ADNOC Offshore (ZADCO) | Supply of 23 Well Head Panels | Zakum Field |
| 1989 | 1989 | Euro Mechanical | ADNOC Offshore (ADMA-OPCO) | Modification of Security System | Das Island |
| 1989 | 1989 | Mutawa | ADNOC Offshore (ADMA-OPCO) | Supply of Materials | Das Island |
| 1989 | 1989 | ADNOC LNG (ADGAS) | Supply of Control Panels | Das Island | |
| 1989 | 1989 | ADNOC LNG (ADGAS) | New Process Control Room | Das Island | |
| 1989 | 1989 | ADNOC Onshore (ADCO) | New Terminal Control Room (DCS) | Jebel Dhanna | |
| 1987 | 1987 | NPCC | Arabian Oil Company | Gas Lift Platform | Abu Dhabi |
| 1987 | 1987 | NPCC | ADNOC Offshore (ADMA-OPCO) | Relief Flare Knock out Drums | Das Island |
| 1987 | 1987 | ADNOC | Supply of Panels | Ruwais | |
| 1986 | 1986 | ADNOC Onshore (ADCO) | Panels Supply, Installation, & Commissioning | Asab | |
| 1986 | 1986 | ADNOC | Water Injection Project | Bu Hasa | |
| 1986 | 1986 | ADNOC Onshore (ADCO) | Panels Supply, Installation & Commissioning | Bu Hasa | |
| 1986 | 1986 | Mutawa | ADNOC Offshore (ADMA-OPCO) | Instrumentation Services at Umm Shaif & Zakum Super Complex | Umm Shaif & Zakum Field |
| 1986 | 1986 | ADNOC LNG (ADGAS) | LNG/LPG Storage Tank | Das Island | |
| 1985 | 1985 | ADNOC | Ruwais Hydrocracking Project | Ruwais | |
| 1985 | 1985 | ADNOC Fertilizers (FERTIL) | Fertilizer Complex | Ruwais | |
| 1985 | 1985 | ADNOC Gas Processing (GASCO) | High Yield Project HYP-7839 | Bu Hasa | |
| 1985 | 1985 | Petromin Shell | Causeway / Tank Farm / Jetties | Al, Jubail, K.S.A. | |
| 1984 | 1984 | Aweidha Polimex | North Al Hayer Water Projects | Al Ain | |
| 1984 | 1984 | Jeddah Municipality | Jeddah Municipality Lighting | Jeddah, K.S.A. | |
| 1983 | 1983 | Mitsubishi Electrical Company | ADWEA | 132kV Substation | Abu Dhabi |
| 1983 | 1983 | ADWEA | Water Well Distribution at Seih Al Meiah | Al Ain | |
| 1983 | 1983 | ADWEA | Water Well Distribution at Umm Ghafa | Al Ain | |
| 1982 | 1982 | Intermediate Petroleum Industry | 4.000 TPY Polyester Plant | Zerga, Jordan | |
| 1981 | 1981 | Foster Wheeler World Services | East-West Pipeline | K.S.A. | |
| 1981 | 1981 | Spie-Batignoles | Public Works | Nadia Standby Power Station at New Abu Dhabi Airport | Abu Dhabi |
| 1981 | 1982 | Khansaheb Gammon | U.A.E. Armed Forces | Electrification of U.A.E. Armed Forces Camp | Abu Dhabi |
| 1981 | 1981 | U.A.E. Ministry of Electricity & Water | Upgrade of 33kV Overhead Lines | Fujairah & Dibba | |
| 1980 | 1980 | Granges-Graver | Tank Farm in Ruwais Refinery | Ruwais | |
| 1980 | 1980 | Fabricom | A/C Fire Fighting, Jeddah National Guards Hospital | Jeddah, K.S.A. | |
| 1980 | 1980 | Dubai Drydocks | Labour Supply | Dubai | |
| 1980 | 1980 | Ministry of Industry & Minerals | Siderurgical Sponge Iron Plant | Khor al Zubair, Iraq | |
| 1979 | 1979 | Granges-Graver | Riyadh National Guards Hospital | Riyadh, K.S.A. | |
| 1979 | 1979 | Jordan Petroleum Refining Co. Ltd. | Zerga Third State Extension Refinery | Zerga, Jordan | |
| 1979 | 1979 | Mitsubishi | DEWA | 132kV Transformers Erection around Dubai City | Dubai |
| 1979 | 1979 | Mitsubishi | DEWA | 132kV Transformers & Busbar System at Jebel Ali Power Station | Dubai |
| 1979 | 1979 | Mohd. Abdul Rahman Al Baher | Caterpillar-Volvo Workshop | Sharjah | |
| 1978 | 1978 | Siemens | 33kV Cabling & Earthing Installation | Dubai | |
| 1978 | 1978 | Granges-Graver | Fuel Tanks EPC | Dubai | |
| 1978 | 1978 | ARCHICAT J.V. | Transit Sheds Mina Sarq | Ras Al Khaimah | |
| 1977 | 1979 | Ruler of Dubai & Dubai Electricity | Electrification of Hatta Village | Dubai |