MEP Works for Habshan Industrial Facilities
Scope of Work
Complete MEP works for 16 buildings of industrial facilities (design, detailed engineering, testing, installation, and commissioning).
Electrical distribution network – 11kV substation (total 15MVA) with 11kV switchgears, transformers, LV switchgears, and bust ducts.
Complete building electrification.
Electrical control system, UPS, and fibre optic backbone.
Telecom system including voice and data system, PA system, access card reader system, and CCTV system.
HVAC.
Fire alarm and fire fighting systems.
Complete MEP works for 16 buildings of industrial facilities (design, detailed engineering, testing, installation, and commissioning).
Electrical distribution network – 11kV substation (total 15MVA) with 11kV switchgears, transformers, LV switchgears, and bust ducts.
Complete building electrification.
Electrical control system, UPS, and fibre optic backbone.
Telecom system including voice and data system, PA system, access card reader system, and CCTV system.
HVAC.
Fire alarm and fire fighting systems.
Email address